03/09/2026
Another one wrapped up ππΌ
Breeze block supply & install for this new gym recovery area.
The brief was to create a dividing wall without completely closing the space off. We ran the wall on a slight wave/curve which worked unreal with the breeze blocks and made it a feature rather than just a divider.
A bit more involved than your standard straight wall, but really happy with how this one came together.
Supplied & installed by The Breeze Block Co.
For breeze block supply, install or both, get in touch with the team.
The Breeze Block Company | Designer Cement Breeze Blocks
13/08/2026
Another Breeze Block transformation taking shape π€πΌ
Supply + Install by CAS & The Breeze Block Co.
Turning a standard brick wall into a feature with our architectural breeze blocks β bringing texture, airflow and a whole new look to the space.
From supply through to installation, we can take care of the complete package.
π Brisbane & surrounds
π© DM us for supply & install enquiries
ArchitecturalDesign OutdoorDesign FeatureWall
29/07/2026
Doing our Pilates studio fitout One Eleven Pilates The cool idea how to dress this concrete pillar hurt the soul a little but the outcome was worth it ππ»
One eleven 111 is a hot Matt Pilates studio on the Scarborough water front π 3/85 Landsbourgh ave definitely worth checking out
The Breeze Block Company | Designer Cement Breeze Blocks
27/06/2026
Level 3 making this the last level on a job in Alex hills roughly 15 - 20,000 blocks glad to see the end of this one last few months rain not on our side to get it done, but the boys kept pushing π«±π»βπ«²πΌ
20/06/2026
Nice little SATDEE Breeze block job The Breeze Block Company | Designer Cement Breeze Blocks
Little 10 hour SATDEE twas π
20/06/2026
Nice Little SATDEE job. The Breeze Block Company | Designer Cement Breeze Blocks
Just a little 10 hour SATDEE π
06/06/2026
New terracotta range from giving this bar in a office space in wollongabba a rustic Mediterranean feel too it
Block : WW
Mortar : Colour matched adhesive
30/05/2026
Big chunk of One of the last things for the new warehouse fit out almost done all coming to an end, last 12 weeks doing 7 days a week 60-80 hour weeks whilst running the boys
Couldn't be happier with how it's turned out everything has a place it works like a dream some might think it's madness but it's how I want it to be and operate I love what I do, nothing better then a properly set up space to work in creating a space your happy to walk into everyday helps to keep you going ππ»
Shout out to my man Paulie been with me 9 years now between us over 55 years in the game making these jobs we have been doing lately the smaller intricate jobs easy with how we work together ππ»
Highway signs approved keep an eye out when driving past northlakes π