09/01/2023
A recent project was a full strip out of the old kitchen. Replace dodgy block work under steel lintels, open up floor to run new foul pipe run for new toilet under the stairs. Full rewire of kitchen. Reboard and plaster walls and ceiling. Fit new sliding concealed door. Perp and tile floor. New windows and door thanks to Dave white. Fit new kitchen and worktops and tile splashback.
02/06/2022
Pre finished oak herringbone hallway with brass mat well trim.
23/08/2021
Pre-finished oak herringbone floor just finished. Ready for the inset carpet and fitted wardrobes.
08/05/2021
One of my recent projects. Knocked through the two rooms and fit new oak French doors. Knock down the high spots on the floor, over ply it and start laying the herringbone flooring to run through out the ground floor.
27/03/2021
Got these finished off today some old concrete stairs, wrapped up in 25mm solid European oak with anti slip brass inserts. In the new distillery in Llandudno. thanks to MattTempletonfor all his help and kev rog for selecting and milling up the oak at Richard Williams.
02/12/2020
Another eu-suite finished recently customer had started the strip out.
23/11/2020
A little en-suite I've just completed
15/10/2020
Solid oak herringbone floor finished today time to give the old knee's a rest now 🤣
11/12/2019
Restoration of an old oak herring bone floor. The floor had suffered from water damage and had to be lifted to install a damp proof membrane. Then relay the cleand blocks, unfortunately i had no spare so all the blocks were numbered and replaced back in the same place😦. Then sanded, stained and hard wax finish. Thanks to Matt Templeton for all his help.
10/12/2019
A reclaimed teak herringbone floor recently finished from self leveling to the finished hard waxing 👍
19/11/2019
Another mahogany herring bone floor finished off.