03/06/2026
From dated tiled open fire to super efficient clean lines woodburning stove ✅
🔥 Ecosy Panoramic Woodburning stove
🧱 T piece calibrated grey riven slate hearth with smooth internal boarding and plaster finish
🪵 real oak shelf with hidden fixing bracket
🌪️ supplied technoflex flexible flue liner and pot hanging buff birdguard cowl
🌳 .treeservices with the cherry picker access
Fully commissioned and registered with
08/05/2026
SWIPE TO SEE THE TRANSFORMATION 🤩
From unsightly unfinished fireplace, to fantastic feature ✅
🔥 Ecosy Panoramic Slimline woodburning stove
🌪️ supplied Schiedel flue liner
🧱 Two piece calibrated black riven slate hearth with ‘sandalwood’ brickslips and pointing
🌳 non combustible deep beam in pale oak character finish
Fully registered and commissioned with
07/05/2026
Chimney Rebuild complete ✅
Revisiting yesterday to connect up the Logburner within the fireplace (photos to follow). As you can see, the rebuilt section has blended in perfectly 👌🏻
Taking time to get the correct red pointing mix, was well worth the effort 🧱
28/04/2026
A view from all angles 😮
🔥 DG Vidar Triple Large woodburning stove
🌪️ Testing and inspecting the original flue, connecting to 🫡
Replacing the inefficient and oversized Logburner left by previous owners ✅
Fully swept and camera inspection carried out
24/04/2026
Chimney Rebuild ✅
Taking the chimney down to a stable level, and rebuilding, utilising existing bricks, with red dye to cement work to match with existing 🧱
Including a full reflaunch and new cowlings to the chimney top. Back soon to connect the Logburner up in the fireplace at the bottom. Photos of that when complete 😮 🔥
23/04/2026
Fireplaces Transformed ✅
Working to remove the original inefficient woodburning stove, replacing with a super efficient ecodesign ready alternative. Relining the open fire through the canopy to make safe for evacuation of all gases 🙌🏻
🔥 blithfield 8 in standard black with stainless fittings
🌪️ supplied Schiedel flexible flue liners
📸 Redundant birds nest removed from around the canopy and full camera survey carried out 🦅
Chimney fully swept .uk
Fully commissioned and registered with . with the fantastic chimney access platform 🤝
22/04/2026
Focal point complete ✅
🧱 supplied honed black granite hearth complete with smooth heatproof internal board & powder coated metal edge trim
🌪️ supplied Schiedel technoflex flue liner
🔥 blithfield 5 in black with stainless fittings
👷 Grind out and repoint to all sides of the chimney stack, treating with masonary cream on completion
Chimney fully swept .uk
Fully commissioned and registered with
21/04/2026
Fireplace Transformation Complete ✅
🧱 Honed Black Granite Hearth teamed with a Powder coated metal chamber box
🌪️ supplied Schiedel technoflex liner with fittings
🔥 Ecosy panoramic slimline multifuel stove
Focal point complete 👌🏻
Flue swept prior to new flue install .uk
Fully commissioned and registered with
14/01/2026
Out with the old an inefficient, in with the new super efficient 🙌🏻
🔥 Huntingdon 20 multifuel stove
🌪️ supplied Schiedel technoflex flue and fittings
🧱 supplied steel grey leathered hearth
Fully registered and commissioned with