Assabet River Rail Trail, Acton, MA Video August 21, 2017, 2:01pm

Videos by Assabet River Rail Trail in Acton. The Assabet River Rail Trail consists of two completed sections: the 5.8m Marlborough-Hudson section & the 3.4 mile Maynard-Acton section. ARRT inc is a volunteer organization that supports cleanups and other projects on the trail.

South Acton Trailhead

The South Acton trail head construction has started. Left to right, will be the rail trail out to the MBTA station, eight parallel parking spaces and the auto turnaround for the trail drop-off. The grading of the future 36-space MBTA 'south side' parking lot has also started.

Other Assabet River Rail Trail videos

Trail of Flowers
18 Maynard volunteers planting 900 & 200 daffodils at Marble Farm & near Cumberland Farms for the first year of the 'Tra...

South Acton Trailhead
The South Acton trail head construction has started. Left to right, will be the rail trail out to the MBTA station, eigh...

Maynard Bridge Installation
The new Maynard ARRT bridge was installed today. One heavy crane, 9 crew, 1 reporter, 3 spectators, 1 MassDOT drone, a f...

Packing down the fill
Packing down the fill, across from the Maynard Golf Course.

It's moving so fast, we switched to video!

About   Contact   Privacy   Login C