04/16/2022
Fuel system upgrade. Modern dual multistage screw on fuel filters. Swivel hydraulic push lock fittings, 200psi soft lines. External pressure gauge, new higher pressure fuel button and shims. New electric fuel shut off and pressure sensor.
05/29/2016
AC duct modifications are complete. Unit cools compartment quickly and uniform. Next task, fab up a slide draw for the generator.
03/24/2016
AC and secondary heater installation. A stand was fabricated to elevate and mount the unit. Next a insulated partition wall was fabricated to allow the compressor to exhaust. Lastly, the duct work must be modified and streamlined to fit and provide clearance for the bathroom to the right.
02/21/2016
3/4 Full Murphy bed complete. Bedroom still needs lights, duct work, closet, hinged closing wall and door. Hinged wall is in the works. More pics to follow.
02/17/2016
With the inside of the walls cleaned up and coated on the passenger side, we installed foam insulation. Next new panels to be installed.
02/16/2016
Starting from SCRATCH -- we had to completely gut the inside of this to implement all the details we wanted to include. It was a hell of a job, but who doesn't enjoy a little demolition work?