09/19/2025
Cutting in a new pad for a large Barndo .
Excavation, Concrete, grading, landscaping,and general contracting.
09/19/2025
Cutting in a new pad for a large Barndo .
09/19/2025
New addition going on in U-City . An all brick and stone faced structure with archways and a second story with custom flatwork up on the second story coming up on the second phase . Long way to go but getting closer .
06/16/2025
Finished up a haul out and grading job for John Burroughs School. Removed a temporary roadway that was used during the construction of the new building. Also removed sidewalk areas as well as a few curb sections . Final portion was to haul in 100+ yards of a compost blend and grade it to prep for the landscapers to install sod . Everything turned out great!
06/14/2025
Nearly wrapped up with a large scale dirt moving job. A 70 acre duck hunting pond will be built with an adjustable flow well to regulate water levels. When not in use the field will be able to be planted with crops and harvested as needed .
06/13/2025
Weather finally held out to complete a tear out and replacement of a driveway in Webster Groves . Also added sidewalks and a front landing area .
03/13/2025
With the weather finally breaking we were able to get out and start getting jobs finished up . Just wrapped up with this front porch in festus . Next portion of this project will be a new roadway and 3 car garage build .
11/26/2024
1,900 sq ft of interior floor poured today in Offalon MO for an addition . Still a lot more to pour at this site coming up soon . Thanks Nick Carico for the help today with 4TK construction .
| Monday | 7am - 7pm |
| Tuesday | 7am - 7pm |
| Wednesday | 7am - 7pm |
| Thursday | 7am - 7pm |
| Friday | 7am - 7pm |
| Saturday | 9am - 4pm |