10/29/2026
SLOW DOWN! It looks like work is coming to an end on the College Avenue pedestrian bridge sewer line bypass. The bypass pipeline has been removed as of this evening, but in the process the sand bags used to weigh down the stands for the barricades have torn and sand has spilled on the approach ramps and bridge itself. This represents a crash hazard, especially in the turns. Exercise caution and slow down until it has been cleaned.