01/21/2026
A shower renovation project we have been working on. The removal of an outdated garden tub has paved the way for a larger walk-in shower. This shower has 3 different shower heads. The next steps involve completing the ceiling and subsequently removing the other shower to install a washer and dryer hookup.
10/22/2025
We've recently completed a couple of metal roofs. Contact us for all your construction needs. 570-485-9624
10/22/2025
The cabin we built is almost finished. Give us a call for all your construction needs. 570 485 9624
08/11/2025
We completed a repair today that entailed lifting a section of the house to replace the rotten sill plate and ledger board.
07/30/2025
Got the stone and cedar shake on the front of the cabin today. Its coming along.
07/30/2025
A little cabin we built and are finishing up.
04/27/2024
This week, we constructed a small playhouse/doghouse.