RiverLogic Solutions was formed in 2013, for the purpose of meeting the demands of the river restoration community in the Mid Atlantic Region and beyond.
RiverLogic Solutions, LLC was formed in 2013, for the purpose of meeting the demands of the river restoration community in the Mid Atlantic Region and beyond. Focusing on construction of dam removals, stream restorations, and wetland mitigation, RiverLogic Solutions also offers a variety of other services, including design/build; pond construction, repair, and dredging; Acid Mine Drainage Projects
; and consultation. The staff of RiverLogic Solutions has an incomparable wealth of experience with river restoration projects, logging well over 100 completed projects involving dam removals, stream restorations, and more. Under previous employment, the members of RLS have amassed a loyal client base through years of unparalleled customer service. With the establishment of Riverlogic Solutions, the clients who have enjoyed our work ethics in the past, have sought our services moving forward. And we have continued to add more satisfied clients who have found us through recommendations and reputation. Riverlogic Solutions uses state of the art equipment and techniques to complete your project. What sets us apart from the competition is our experience and dedication to the river restoration industry. Every member of our team has extensive experience in watershed restoration, and this is all we do. The staff of RLS not only has vast experience in River Restoration, but also extensive training, including all levels of Rosgen, and classes from various disciplines of the industry. And we go beyond the standard contractors’ scope of work: we are qualified to, and often do, provide consultation to project designers and funders throughout the process. This can be consultation during the pre-design phase, the design phase, or aiding the engineer or client in making improvements to the design during construction, based on ever-changing site conditions. Do you want your project built exactly as intended? RiverLogic Solutions uses the latest surveying technology to ensure precise stake-out throughout your project. No more guessing, no more waiting for a surveyor, and no more cutting corners on stake-out to save cost. RLS has the means to take coordinates from the CAD file, and stake them in the field on all projects. Browse our web site to get more information on our company and operations. Meet our staff, view our client base, check out our safety program, and look over our library of past projects. See what makes us the right choice!
02/13/2017
Boy, oh boy, does this video capture the changes we make on rivers. Thank you to US Fish & Wildlife Service for the film!
We are proud to be a part of this historic visit to our project by the US Secretary of the Interior, Honorable Sally Jewell. RiverLogic is the contractor for the construction of this fifth dam removal on the Musconetcong River.
Another great restoration project by RiverLogic Solutions, LLC. See us at work in this time lapse and backstory video.
Hyde Pond Dam Removal
For the first time in over 350 years, Whitford Brook flows free! Save the Sound, supported generously by the U.S. Fish and Wildlife Service, Patagonia, the L...
09/29/2015
We were just given a mention in the Fall 2015 edition of Trout Magazine by Trout Unlimited, and the article can found on line at the link below.
This project was part a cold water fishery restoration program, and we are proud to have been able to assist the Horwith family (owner of the dam), Hokendauqua Chapter of Trout Unlimited, PA Fish and Boat Commission, the Wildlands Conservancy, and Bill Weihbrechtt of AECOM (formerly URS).
Finding trout as Salmon Kill restoration gets under way
Restoration construction efforts on this section of the Salmon Kill were almost complete when this picture was taken. Trout stream restoration projects can make a big immediate visual impact, but the real payoff comes over time. Still, it was a nice surprise when crews doing some stream sa
09/11/2015
Completing the installation of LWD (remember, this stands for Large Woody Debris) on a bend on the Salmon Kill in northwest CT. This was one cool and heck of a complicated structure, and a great effort for the project team! This is perfect for bank and channel stabilization, and habitat. Client: Northwest CT TU and Trout Unlimited, Engineer: Woidt Engineering
09/10/2015
RLS is on the Salmon Kill in the northwest corner of Connecticut helping Trout Unlimited achieve their goals of creating fish habitat and a healthy stream using what we in the industry call LWD (Large Woody Debris).
We'll post project updates from time to time to show you our progress.
For background on the project, check out the TU Salmon Kill Project webpage.
Good morning. We at RiverLogic welcome you to our new Facebook webpage. We will use this page to provide our clients and "likes" with updated status of our projects as they happen.
Want your business to be the top-listed Gym/sports Facility in Wellsville?