16/05/2026
The AS Lodge team participated in the Annual Sports Group Conference 2026 held in Macau. It was a fantastic opportunity to learn about new product availability, technological advancements, and key challenges facing the industry.
These valuable insights will further strengthen AS Lodge’s ability to deliver high-performance products and exceptional service to all our customers. We look forward to continuing to grow, innovate, and support our customers with the very best solutions. Great catching up with the rest of industry members.
21/02/2026
🏗️ Another Great Project Completed – De La Salle College
Proud to share the completion of our latest full construction project – transforming a blank, underutilised space into a high-quality, purpose-built sports area, now ready to be enjoyed by the school community.
This project included:
✔️ Full site excavation
✔️ Crushed rock base installation
✔️ Drainage works
✔️ Concrete kerb construction
✔️ 3m high chain mesh fencing
✔️ Installation of brand-new Australian manufactured MatchPro surface
Another set of premium courts delivered, providing a first-class playing experience for students and visitors alike.
A big thank you to everyone involved — great teamwork and a fantastic outcome. 👏
13/02/2026
🏆 Before & After — Another Project Completed! 🎾
A S Lodge is proud to showcase the transformation of this tennis court renovation in Toorak — delivered with a premium finish built to last.
Project highlights:
✔️ Removal of existing surface
✔️ Re-installation with Match Pro Grass
✔️ New sleeves, net & posts
✔️ 3.6m chain-link fence with draw curtain
✔️ Concrete base upgrade
✔️ ASL BB Tower with basketball lines
✔️ A.S Lodge ACE tennis court lighting
Huge thanks to our crew for their craftsmanship and dedication, and to our client for trusting us with their court transformation.
Looking forward to many more successful builds ahead! 💪
05/02/2026
Stringent engineering principles are applied to each AS Lodge court throughout all earthworks activities, ensuring subgrade stability, correct formation levels, drainage performance, and long-term structural integrity in accordance with relevant Australian Standards and project-specific geotechnical recommendations.