RVRT Non-urban Segments – Some Funding Suggestions – September 2026:
In a recent Facebook Post [August 28th 2026: S2S/RVRT Funding Considerations - Revisited] we highlighted the need for different funding approaches for the longer, more isolated, non-urban trail segments (for which special purpose, targeted funding will almost certainly be required), compared with the shorter, self-contained and largely urban S2S/RVRT sub-sections (which are suitable candidates for existing recreational and active transport programs) [Link to Post: https://www.facebook.com/richmondrailtrail/posts/pfbid02YPvNqxHfkq4p6bwDrc5ZgfPH54dZvDzmmuNkU7orkfytMJnZLAEFuwRy6rrfzxMgl].
At that time, we identified four potential self-contained S2S/RVRT sub-sections (labelled A, B, D and E) that could be prioritised for finalised design and construction funding [which you can also read about on our News page - https://www.richmondvalerailtrail.org.au/news/s2srvrt-funding-considerations-revisited-august-2026]. They ranged in length from 3km to 6km, with approx. costs between $6m and $9m (totalling $28.5m). Two of the urban sub-sections [B: S2S/RVRT Midpoint in Kurri Kurri; and D: Fletcher/Minmi Key Transition & Construction Point] would be prime candidates for community connection focussed funding programs such as Get NSW Active. Sub-section A (a non-urban 5km Wine Country S2S segment) could attract tourism and related regional transition funding, while sub-section E (Beresfield/Tarro Connection) and the whole of the 7.5km Shortland to Tarro segment definitely meets the criteria for the Federal Government’s expanded Active Transport Fund [e.g., a self-contained bicycle or walking pathway that is ‘on or associated with a public road’ – in this instance, the New England Highway (Maitland Road) and the recently upgraded ‘Hexham Straight’].
The current Post is primarily about the non-urban, historic and magnificent Premier Sugarloaf Range RVRT Section (between Lenaghans Drive and Wallis Creek in Buchanan, which we have tagged as sub-section C). It is time to start moving on preserving, protecting, constructing and promoting this critical RVRT corridor, which sits largely within the Stockrington State Conservation Area.
Proposed Non-urban Sub-segments to Prioritise:
While it would be preferable to seek and secure funding for construction of the whole of the RVRT, or alternatively for the full 13km Premier Sugarloaf Range RVRT Section, the reality is that piecemeal but progressive construction of accessible non-urban sub-segments is a more achievable goal.
In considering which non-urban RVRT sub-segments to prioritise, we were mindful of several factors:
1) Uniqueness and Attractiveness, including Key Features (e.g., historic tunnels, cuttings and embankments) and Proximity to Other Nearby Attractions (e.g., creeks; dams; conservation areas; open spaces; and heritage engagement/promotion opportunities);
2) Accessibility (e.g., for both construction and operation, including distance to nearby public roads or trails) and Ease and Cost of Construction (e.g., relatively flat; no major structures required, or utilities or crossings to negotiate; manageable safety and fencing requirements); and
3) Absence of Other Constraints (e.g., existing or pending concept-level approvals; outside of Coastal Wetlands segments; no outstanding land ownership or acquisition issues).
The two accessible non-urban RVRT sub-segments that we are recommending (C-1 and C-2, totalling approx. 9.4km) are marked on the extracted Stylised Map of the ‘Rail Trail & Wetlands Zone’ in Pic01. This image also identifies the parts of the RVRT (brown line) that received concept-level approval in December 2021 [Eastern Section, Sections S5 and S5a, within Newcastle LGA (DA2020/00641)] or May 2023 [Review of Environmental Factors, REF, for Western section (Section S4), within Cessnock LGA].
The unmarked portion in sub-section C (no brown line) is the 2.7km segment within Lake Macquarie LGA, which includes Tunnel #1 and Tunnel #2. Notwithstanding, the REF also covered the Lake Macquarie LGA segment; moreover, it is our understanding that Lake Macquarie City Council will undertake the required internal approvals processes when construction is scheduled. So, both of the proposed RVRT sub-segments (C-1 and C-2) contain a short Lake Macquarie LGA section (approx. 1.8km & 0.9km respectively) and have a larger segment in Cessnock LGA (approx. 2.6km & 4.1km respectively).
The Modified REF General Arrangement Map in Pic02 further illustrates the location of the recommended sub-segments, together with the Tunnels and best Access Points. See Pic04 for recent photos of these Road Access Points (4/9/2026), which currently have locked gates.
The left-hand column of the Table in Pic03 summarises the main features of the 4.4km Proposed C-1 Sub-segment between Dog Hole Road (Stockrington) and the Tunnel Fire Trail Crossing (West of Tunnel #1, Seahampton). Pic05 presents an overview of the C-1 route, while Pic06 and Pic07 showcase the natural and man-made beauty within that area.
Likewise, the right-hand column of the Table in Pic03 summarises the main features of the 5km Proposed C-2 Sub-segment between the Tunnel Fire Trail Crossing (Seahampton) and the Hunter Expressway Construction Access Road (Buchanan). Pic08 presents an overview of the C-2 route, while Pic09 showcases its history and beauty, including some extracted drone images from Bill Landenberger.
We are not suggesting that construction of these sub-segments will be all ‘smooth sailing’; as, no doubt, some unexpected issues will arise and there are 44 Conditions associated with the REF Approval that need to be addressed. On the other hand, it does provide a good opportunity for a host of agencies to demonstrate that they can co-operatively work together [including the participating Councils (Cessnock and Lake Macquarie) and NSW National Parks and Wildlife Service (NPWS)]; as well as an opportunity for a concerted collective effort by all tiers of Government, and local businesses and community groups, to support and promote an initiative with demonstrable long-term community and regional benefits.
Hopefully, construction of one accessible, attractive and comparatively straightforward (but otherwise difficult to fund) non-urban RVRT sub-segment within the Sugarloaf Range will, in effect, be a self-sustaining strategy (as users get to experience first-hand the iconic nature of this Hunter Valley trail) – providing a solid stimulus for subsequent grant applications and construction activities by local Councils.
Thanks to all of our RVRT and S2S supporters.
Cessnock City Council
Lake Macquarie City Council
City of Newcastle
Hunter Joint Organisation
Newcastle Cycleways Movement
Clayton Barr MP, Member for Cessnock
Sonia Hornery MP
Tim Crakanthorp MP
Yasmin Catley MP
Meryl Swanson MP
Dan Repacholi MP
Sharon Claydon MP
Pat Conroy MP
Bicycle NSW
Rail Trails for NSW
Rail Trails Australia