Behind the Bellarine Railway

Behind the Bellarine Railway A behind the scenes look at the operations of the Bellarine Railway

No6 - Coming TogetherWork has really stepped up a notch on Fyansford No6, thanks to a few extra hands ready and keen to ...
20/09/2026

No6 - Coming Together

Work has really stepped up a notch on Fyansford No6, thanks to a few extra hands ready and keen to learn how to restore a locomotive properly.

Work continues on the paint prep of the frames, with high fill primer now appearing on a few components. The connecting rods have been polished up, and the crosshead painted too.

One side of the new smokebox has been fitted up with holes drilled for mounting to the boiler tube plate.

The rear cab wall is really starting to come together, now all panel work repairs have been completed and the lower section (which is entirely new) is being fitted up to the running boards and frames.

Projects like this would gratefully appreciate donations toward the final expenses such as primer and paint:
www.bellarinerailway.com.au/donate

Klondyke - Winter maintenance and boiler inspectionAfter spending winter in the workshops while Pozieres ran our trains,...
20/09/2026

Klondyke - Winter maintenance and boiler inspection

After spending winter in the workshops while Pozieres ran our trains, Klondyke is almost ready to return to service!

In addition to the annual boiler inspection, we have made a few notable improvements.

In the drivers cab, we’ve sourced and fitted new gauge glasses, with new glass protectors (not pictured) also custom made in-house. The turret has also been rebuilt with new steam valves, and the turret studs (connecting it to the boiler) have been replaced.

The smokebox has also received a lot of attention. As well as a repaint of the smokebox, the fireman’s side steam pipe has been replaced. This pipe carries steam from the boiler to the pistons to make the wheels go around, and the old one had suddenly developed a large hole.

We purchased enough pipe to renew the drivers side, and make both steam pipes for Fyansford No11 when the time comes. 👀

We plan to unleash Klondyke this week, ready to double head with Pozieres on the Seaside Explorer on Friday.

www.bellarinerailway.com.au/seaside-explorer

Something not often seen - our ballast train over the inspection pit.This week it was time for the scheduled maintenance...
17/09/2026

Something not often seen - our ballast train over the inspection pit.

This week it was time for the scheduled maintenance inspection, and a brake adjustment.

The ballast train, consisting of five wagons (three from Tasmania and two from Queensland) was back out the following day keeping up with our continuous track tamping effort.

Last weekend - a quick repaint for van NVD 1263!We have been using this van to transport event materials between Queensc...
07/09/2026

Last weekend - a quick repaint for van NVD 1263!

We have been using this van to transport event materials between Queenscliff and Lakers Siding for our various family events.

Its earned a repaint! This time it’s something a little closer to its original Commonwealth Railways livery.

Great work from Jake, Ryley, Jeremy, and Jordan on this one.

Love to see the behind the scenes of the Bellarine Railway? Check out our brand new Youtube series "Past the Platform" f...
26/08/2026

Love to see the behind the scenes of the Bellarine Railway? Check out our brand new Youtube series "Past the Platform" for an exclusive look at everything you can't see from the platform!

STEAM TRAINS - Where next?Everyone seems to ask where the steam program is at, now that Pozieres has returned to service...
13/08/2026

STEAM TRAINS - Where next?

Everyone seems to ask where the steam program is at, now that Pozieres has returned to service - so heres a bit of a report.

Pozieres, Klondyke, and 3620 are currently in service, with T251 having a well deserved stay in the workshop.

Work on reactivating G33 is also progressing well - the front engine unit has been turned ready for connecting back up to the rest of the loco.

Here’s the exciting stuff 👇

Boiler work is now well advanced on No4, an 0-6-0 saddle tank locomotive which has not operated since 2009. The boiler has been rolled over with the smokebox removed, and condemned barrel sections have been cut out ready for replacement.

Our pressure vessel welder continues to work on this boiler when he attends, and is making very quick progress. Boiler tubes for this boiler are inbound from New South Wales at the moment.

Additionally, locomotive M6 has been relocated to the workshop, to be worked on if No4 works are held up awaiting materials. This makes the most of the paid contractors time on-site, as the repairs to M6 boiler are well within the scope of their abilities.

Additionally, a significant investment has been made into ex-Fyansford Cement Works locomotive No2 (a Beyer-Garratt).

As the railway looks to the future, it is important to understand the condition of every locomotive available, and make the correct call on which ones to prioritise.

This is where No2 fits in - the asbestos insulation has been removed from the boiler to assess its condition, and we were pleased to discover that it’s very good! As such, No2 takes its place in the restoration queue at some stage in the future.

If you’d like to help us cover the costs of some of these huge milestones, please consider donating:

www.bellarinerailway.com.au/donate

24/07/2026

There's a lot more to operating a heritage railway than just running services. This past weekend, our volunteers held a working bee at Lakers Siding and achieved a massive cleanup of our main shed and firewood storage areas. A huge thank you to all involved!
Interested in volunteering? Visit https://bellarinerailway.com.au/volunteer/

Another huge fortnight from our volunteers! We ran an extremely successful evening Seaside explorer for "Nightide festiv...
30/06/2026

Another huge fortnight from our volunteers! We ran an extremely successful evening Seaside explorer for "Nightide festival" featuring a surprise guest appearance from 3620 who was on test following some repairs.

We also have to thank Craig Elstone from Elstone Diving Services Pty LTD who very kindly sandblasted and primed the second TGR A pattern bogie as part of ABL14. This carriage is currently having new swinglinks and bogie brackets being manufactured.

Big month for fans of Fyansford Cement works as well!

Beyer Garratt Number 2 has successfully had its asbestos removed by contractors from Kennedys plumbing. We will be launching an appeal on this locomotive soon but in other news work has begun by our professional boilermaker to begin work on Vulcan number 4. This included making a rotisserie so it can be rolled over and removing its smokebox ready for work.

If you'd like to assist us you can donate to any of the above projects by following our link https://bellarinerailway.com.au/donate/ and with your help we can continue to make great progress!

30/06/2026

Last chance for your EOFY tax deductible donation to help us in the restoration of rail history!

Pozieres is back in service, so it’s time to continue on with the next locos in line for restoration!
No.2 Garratt has recently enjoyed a major milestone, with significant resources from our museum fund spent on asbestos removal in preparation for staged restoration.
Further donations will be dedicated towards specialist labour, fabrication and machining, and boiler and mechanical rebuild works.
There is also the ongoing restoration of ASG 33,and VA1, as well as continuous running maintenance to our operational fleet!

All donations remain tax deductible and are essential to maintaining momentum in the preservation of heritage rail. Donation links and more information are available at https://bellarinerailway.com.au/donate/

History was made tonight! 💡 For the first time in the entire preservation history of The Bellarine Railway, ex-Queenslan...
19/06/2026

History was made tonight! 💡

For the first time in the entire preservation history of The Bellarine Railway, ex-Queensland suburban carriages BUV1299 and BU465 have been united with functional lighting!

In readiness for our Winter Solstice Seaside Explorer this Saturday night, the entire lighting system in BU465 has been rewired and essentially rebuilt from scratch!

The lights in BU465 haven’t worked since it left service in Queensland in probably the 1980s.

More detail on this massive task soon!

What a great achievement from the team at Lakers!

Address

20 Symonds Street
Queenscliff, VIC
3225

Opening Hours

Monday 9:30am - 5pm
Tuesday 9:30am - 5pm
Wednesday 9:30am - 5pm
Thursday 9:30am - 5pm
Friday 9:30am - 5pm
Sunday 10am - 4pm

Telephone

+61 52582069

Alerts

Be the first to know and let us send you an email when Behind the Bellarine Railway posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share