Momentum on site this month 🏗️
✅ Major structural steel progress continues, with two roof trusses now in place in the SW corner and steel climbing on the north side for the upper bowl, food hall and the flagship retail store.
✅ Exterior framing and drywall continue along the South side, moving west above the Indoor Plaza and restaurants
✅ Concrete pours continue, including the loading dock and exterior parkade walls
Plenty more progress ahead, stay tuned 👀
Scotia Place
Future home to the Calgary Flames, Hitmen, Roughnecks, Wranglers and world-class entertainment. This is just the beginning.
04/15/2026
As Scotia Place continues to rise, we’re excited to give you a closer look at Calgary’s next great gathering space! Our latest renderings showcase spaces that will bring sports, music and community together in one dynamic environment! Check out the Indoor Plaza (a year-round gathering space located at the heart of the building), our flagship retail store, and The Esso Community Arena!
https://www.scotiaplace.com/project-overview/
Major Construction Milestone for Scotia Place 🚧 presented by
The roof is officially going up as the building begins to close in 🏗️ The first of four mega trusses is now in place, marking a huge step forward made possible by months of planning and teamwork.
Designed for flexibility, the roof will support concert rigging and a retractable scoreboard, enhancing the fan experience from every seat.
As the weather warms up, so does the momentum on site ☀️
🚧 Scotia Place Construction Update 🚧
Presented by
February delivered strong progress across the Scotia Place site 🔥
✅ Continued exterior framing and paneling across the site
✅ Expanded steel installation on the west side restaurants and started the indoor plaza entrance
✅Installed precast concrete seating in the upper bowl, with the south side now complete from the first to last row
✅ Installed temporary tower support for the first roof truss
Stay tuned for more updates as Scotia Place continues to rise ✨
The World Cup Of Hockey 2028 is coming to Calgary 🔥 We cannot wait to show the 🌎 our incredible city during the best-on-best tournament!
03/16/2026
BRINGING THE WORLD TO CALGARY!
We’re so proud to be co-hosting the World Cup Of Hockey 2028 at Scotia Place!
More info: https://cflam.es/2028WorldCupOfHockey
03/16/2026
The Commissioner definitely liked what he saw during his Scotia Place site visit 🔥
Major Construction Milestone for Scotia Place 🚧 presented by
Major interior progress as the fan experience starts to come to life. 🔨
✔️ Indoor plaza structure taking shape
✔️ Seamless access from premium spaces directly to bowl seating
✔️ Calgary Flames dressing room build-out in progress, including therapy, treatment, and team spaces
✔️ Suites level progress between the lower and upper bowl
With interior systems moving quickly, these spaces are on their way to becoming vibrant restaurants, premium lounges, and unforgettable game-day experiences 🤩
Major Construction Milestone for Scotia Place 🚧
presented by CANA Group of Companies
A new year brings major progress on site as the arena really starts to take shape. 🔨
✔️ Structural steel reveals the overall shape of the arena
✔️ Precast forming the inner bowl, including walls, floors, and seating areas
✔️ Thousands of precast pieces delivered efficiently from Central Alberta supporting this schedule-critical work
With structural steel continuing and the building envelope and roof coming next, interior work will continue to progress throughout the year, bringing the fan experience closer to reality 🤩
Major Construction Milestone for Scotia Place 🚧 presented by CANA Group of Companies
Despite cold, windy winter conditions outside, construction continues on schedule inside. 🔨
✔️The second tier of steel is officially up (highest point of the building)
✔️Upper concourse poured out
✔️ Mechanical, electrical, plumbing, and sheet metal rough-ins underway
✔️ Wall construction started on the lower levels
You can now stand on every level of the building and truly get a sense of the fan experience for games and concerts coming to life 🤩
🚧November Construction Update is in! 🚧 Presented by CANA Group of Companies
Concrete has reached new zones across the NW main concourse and the NW mezzanine, plus the SW restaurant area is officially underway. Steel is rising on the south concourse, and installation of the metal deck has begun on the suite level, gearing up for upcoming concrete pours.
Every beam and every pour brings us closer to a next-level experience for Flames fans, concerts, and community events. 🏒🎉
Click here to claim your Sponsored Listing.
Location
Category
Contact the business
Website
Address
Calgary, AB