06/03/2026
We did some minor rewiring and was able to get power out to a camera to monitor site progress / conditions.
One stop shopping for all your electrical and control needs.
06/03/2026
We did some minor rewiring and was able to get power out to a camera to monitor site progress / conditions.
We were back on the island for a little electrical upgrades which included a panel upgrade and some new outlets
Signed off on this one today.. Engineer approved repair of a broken J bolt.. Hilti 2 part epoxy .. had on site for cutting and support.. see you on the next one .electric
04/15/2026
Demolition carries on at Oshawa Center.
Back at the club for some preventative maintenance.
Oshawa Center had us to look at a leaning pole. It turns out the sonotube had a broken J bolt.