21/06/2022
One of our projects in 6 October city vacations building for USAC
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Alnour.steel, 6 October City, 6 October City.
AL Nour Steel Fabrication is a professionally managed company serving the industrial sector in Egypt since its formation 2012 Al Nour Steel main areas of operational focus on the quality & customer satisfaction Being part of Al Nour for Steel Fabrication
21/06/2022
One of our projects in 6 October city vacations building for USAC
12/06/2022
The extension of saveto factory el sadat city
30/05/2022
The construction of bridges between the buildings and an escape staircase has been completed
14/04/2022
One of our work in the Tenth of Ramadan City is a pharmaceutical factory
29/03/2022
An escape staircase and elevator have been installed
Project location: 6 of October city
Project owner. : Gentech pharmaceutical
21/03/2022
Concrete building roof installation completed
Project location: Obour city
Project owner. : Engineering Egyptian company
12/03/2022
Completion of the installation of a two-storey steel building with a protective cover for the elevator
Project location : 6 October city
Project owner. : Akzonobel
Main contractor. :Makin for construction
21/02/2022
The installation of 3 fire tanks with a height of 6 and a diameter of 3 meters has been completed
Project weight. :15 tons
Project location. :10 th of Ramadan
Project owner. : Egyptian engineering company
for medical industries
06/02/2022
The installation of 3 mezzanines with four service stairs has been completed with the Shaker sheet for the Far Mall
Project weight : 42 tons
Project location : Madinaty Entrance
Project owner : El Far
Main contractor : Impact
31/01/2022
Thanks to god, football playground installation over a swimming pool is almost done now.
Project weight : 70 tons
Project location :Badr city
Project owner. :Utopia International school
24/01/2022
We're almost done our work at Saint.Gobain factory (warehouse with 3 crane )
Project weight : 500 ton
Project location : Ain sokhna
Project owner. : Saint-Gobain
Main contractor : Makin for construction