We've spent time building logs walls, topping them off with wild flower seed, stripping areas back and letting them re grow
But the best flower we've got is growing in a pile of waste!!
The bees are absolutely loving it๐
Ashton and Lea greens
Brief insight into the on goings at Ashton & Lea
1st leak on the irrigation this season๐๐
We reckon the system is 33 yr old๐ด๐ด, that's 13 yrs past it's predicted life!!!
The club invested in a brand new scarifier this winter, 1st time using it today.
Going in 10mm, very little mess, very tidy job.
Best machine on the market
19/01/2022
Right hand side 12th done, probably got 1 more in our locker this winter...not sure which one we're gonna do next
14/01/2022
Productive winter so far๐๐๐
14/01/2022
The left bunker on 12th construction complete. Now onto the right, hopefully done by the middle of next week
22/12/2021
The construction of the 11th bunkers is complete.
Turf and sand in the new year will finish them off.
03/12/2021
Big eco bunker week. 2 day job on the left of the 11th, biggest we've done yet!!!!
And the small one to the left of 5th
26/11/2021
Bunker 1 built of the 8 we are planning on doing this winter.
Right hand side of the 5th
Course currently closed. Inspection at 10
Course currently closed, inspection at 10:30
Click here to claim your Sponsored Listing.
Location
Category
Contact the business
Telephone
Address
Off Tudor Av, Blackpool Road
Preston
PR40XA