05/05/2022
One more pitch completed today at Glebe Park Brechin City FC Never had time today to get pictures of the machines working but here’s a great aerial shot of the grounds.
Sportsturf Contractors & Suppliers of fine turf products
05/05/2022
One more pitch completed today at Glebe Park Brechin City FC Never had time today to get pictures of the machines working but here’s a great aerial shot of the grounds.
04/05/2022
Another pitch reno ticked off the list at Heriot-Watt Uni. We took the top off & mixed fresh Fibre-Sand into the surface, then we Rotor-Raked it to achieve the perfect levels & rolled it. Finally the seed went on today.
04/05/2022
Chipping area complete at Whitecraigs Golf Club which was a great project and challenging with the weather to start with but Turned out great in the end ⛳️⛳️⛳️⛳️ Larger green with lots of different shots to be hit and a smaller green with 3 bunkers.
03/05/2022
That’s the boys completed another renovation today. Packed up and ready to go to the next one. Putting all the new machines to good use!
24/04/2022
This is a tee which we built with the staff at The Royal Automobile GC down in Epsom just before Christmas. It is now in play and looking magnificent. What a great way to start the course at the first tee. Green staff have done a great job growing it in! Plenty of surface area to keep wear to a minimum.
23/04/2022
Renovation works completed this week in Rosyth for Dunfermline Athletic FC Will be a great spot for the team to train. Scarified, over-seeded, top dressed and then terra-spiked.
23/04/2022
Another job done this week was at The Duke's Course, St.Andrews putting the base in for a new 300m2 artificial tee on the driving range. The tee was installed at 3 different angles to make them aim up the middle of the range.
17/04/2022
A job well done up at Stirling University all pitches sand spread with new PC4 sand spreader and all pitches Terra-Spiked with our new Wiedenmann XP8. Two great bits of kit. Thanks to Robert at Fairways GM and Mike at Wiedenmann
04/04/2022
Recent buggy path built at RAC golf club Epsom.
The path was a cut around the hillside to level the sub-base then fill what would have been a steep drop to make the path flow.
Edges were reclaimed railway sleepers which were a touch heavy 💪🏻💪🏻 great job from the team!!
03/03/2022
The last 4 days has seen us down at Dundonald Links draining and reshaping a putting green in front of a cluster of newly built lodges. 800Tonnes of sand was brought into the green to build it up 500mm.
17/02/2022
Drainage works completed Panmure Golf Club challenging digging with fluctuating water table but it all came together in the end. Thanks to Gary and his team for their help.
10/02/2022
A bit of reshaping at Kingsknowe Golf Club (KGC) to direct surface water to a new catchment chamber, which is now connected to an existing drain.