24/09/2026
🌱 Maintenance Week Completed
After a long, dry summer, the greens have had some much-needed TLC this week, helping them recover and prepare for the months ahead.
The week started with hollow coring using ½-inch tines, removing compacted material and improving air and water movement through the greens.
We then applied 20 tonnes of topdressing, followed by a Verti-Drain using ½-inch tines to a depth of 12 inches to relieve compaction, improve drainage and encourage deeper root growth. A further 20 tonnes of dressing was then applied and brushed in.
The greens were then treated with small pencil tines to 3 inches, before being cut and ironed, with fresh holes cut and ready for play.
The greenstaff also managed to squeeze in some tee renovation, hollow coring the surfaces before seeding greens, aprons, tees and selected weak areas. This will help encourage new growth and aid recovery from the stresses of the summer.
Alongside all this, selected areas of gorse were removed, while some holes were closed to allow work to be carried out.
A brilliant effort from our greenstaff, with some long days and plenty of hard work making it possible to get all of this completed.
The aim of all the work is to relieve compaction, improve drainage and growing conditions, encourage stronger root growth and help the playing surfaces recover and remain healthy going forward. 👏🌱