27/10/2022
GENERAL MEETING ! GENERAL MEETING!! GENERAL MEETING !!!
ALL ATTCOSA GROUPS
THEME :
Consolidating the fraternity
VENUE : ATTC, CIDA Hall.
DATE : 6th November, 2022
ARRIVAL Time: 1:00pm
CLOSING Time: 5:00pm
PURPOSE :
> Nomination of an Electoral Committee
> Outlines of the ATTCOSA Executive positions per the constitution by the Electoral Committee
> Interested aluminus to indicate the position of their choice to be voted upon on the meeting day
> Next meeting day
DISTRIBUTION :
1. ATTCOSA 2021 platform
2. Registered ATTCOSA 2022
3. The Ancillary Group Leaders
22/08/2018
Standard Room Sizes:-
€€€€€€€€€€€€€€€€€€€
Small β 6 x 6
Medium β 8 x 10
Large β 8 x 15
CLOSETS (24β³ minimum inside
dimensions)
Small β 2 x 3
Medium β 2 x 4
Large β 2 x 6
ROOM
Small β 4 x 4
Medium β 5 x 5
Large β 6 x 6
ROOM
Small β 16 x 18
Medium β 18 x 24
Large β 20 x 28
ROOM
Small β 12 x 18
Medium β 16 x 20
Large β 22 x 28
ROOM
Small β 10 x 12
Medium β 12 x 16
Large β 14 x 18
ROOM
Small β 12 x 16
Medium β 14 x 20
Large β 16 x 24
ROOM
Small β 12 x 18
Medium β 16 x 24
Large β 18 x 30
ROOM
Small β 10 x 14
Medium β 12 x 16
Large β 14 x 20
Small β 5 x 10
Medium β 10 x 16
Large β 12 x 20
AREA
Small β 10 x 10
Medium β 12 x 12
Large β 16 x 16
Small β 2 x 2
Medium β 3 x 4
Large β 4 x 6
Small β 3 x 6
Medium β 6 x 8
Large β 8 x 10
/MUD ROOM
Small β 5 x 6
Medium β 6 x 8
Large β 8 x 10
REAR ENTRY CLOSETS (24β³ minimum inside
dimensions)
Small β 2 x 3
Medium β 2 x 4
Large β 3 x 6
Small β 12 x 20 (1 car)
Medium β 20 x 20 (2 car)
Large β 24 x 24 (2 car w/storage)
Small β 6 x 8
Medium β 8 x 10
Large β 12 x 16
ROOM
Small β 6 x 6
Medium β 8 x 10
Large β 12 x 14
OFFICE / WORK ROOM
Small β 8 x 10
Medium β 12 x 14
Large β 14 x 18
BED ROOM
Small β 12 x 14
Medium β 14 x 20
Large β 16 x 24
WALK-IN CLOSETS (24β³ min inside dim)
Small β 4 x 6
Medium β 6 x 6
Large β 6 x 8
BATHROOM
Small β 6 x 9
Medium β 8 x 12
Large β 10 x 16
Small β 10 x 10
Medium β 12 x 12
Large β 14 x 16
CLOSETS (24β³ min inside dim)
Small β 2 x 4
Medium β 2 x 6
Large β 2 x 8
BEDROOM
Small β 10 x 12
Medium β 12 x 14
Large β 14 x 18
GUEST CLOSETS (24β³ min inside dim)
Small β 2 x 3
Medium β 2 x 4
Large β 2 x 6
BATH
Small β 6 x 9
Medium β 7 x 10
Large β 8 x 12
BATHROOM
Small β 5 x 9
Medium β 6 x 10
Large β 7 x 12
LINEN CLOSETS (12β³ min inside dim)
Small β 1 x 3
Medium β 2 x 4
Large β 3 x 6
Small β 10 x 10
Medium β 12 x 12
Large β 14
22/08/2018
*TODAYS TOPIC - SEQUENCE OF A to Z BUILDING ACTIVITY*(we already discuss his topic, but any one want to add points to this topic is welcome)
_*Below is the final sheet.So anyone want to add/change , he is *welcome.Copy below sheet , do changes and again repaste the same again.and in next sentence mention the changes done_
*SUB STRUCTURE*
*1. Building Design(Feasibility study;Soil tests,Structural element designs etc)
2. Plan passing in government authorities
3. Site Establishment (Site location; Mobilisation of resources etc)
4. Site Clearance
5. Setting Out.
6. Excavations and all related Earthworks
7. Steel fixing
7. Concrete works
9. Concrete Curing
10. Back filling and compaction
10. other ancillary works*
*SUPER STRUCTURE*
Start column casting
Slab casting
Rcc hacking
Bbm work
Internal plaster
Plumbing
Water proofing
Tile work
External plaster
Door/ window fixing
Fabrication work
Paint
Cleaning