10/08/2026
The last of the white lines going in today at Listry GAA in County Kerry for a 106m x 63m artificial grass GAA pitch.
PST Sport | Leaders in Artificial Grass Pitch Construction
We design and build world-class artificial grass pitches across Ireland and the UK.
We offer complete turnkey solutions for Football, GAA, Rugby, Hockey & more. #YourPitchOurPassion PST Sport is a leading installer of artificial grass pitches and sports floodlights across Ireland and the UK. Located in Tralee, Co. Kerry and with offices in London and Dunshaughlin, PST Sport now has a global reach backed up by experienced and knowledgeable staff who are experts in their field. PST
10/08/2026
The last of the white lines going in today at Listry GAA in County Kerry for a 106m x 63m artificial grass GAA pitch.
10/08/2026
Earlier this year, PST Sport delivered a full-size, GAA-approved artificial grass pitch for Tuosist GAA Club in Co. Kerry.
This was a landmark project for the club and wider community, and one we were proud to support from the outset.
This is more than just a pitch. It is the result of years of hard work and determination from a rural community committed to creating something lasting for future generations.
A great article from The Kerryman captures the story behind the development and what it means for Tuosist.
We are incredibly proud to have played our part in bringing this vision to life.
Kerry parish receives ‘massive’ praise as they look to finish state-of-the-art GAA complex
𝗙𝗿𝗼𝗺 𝗪𝗮𝘁𝗲𝗿𝗹𝗼𝗴𝗴𝗲𝗱 𝘁𝗼 𝗥𝗼𝗰𝗸 𝗛𝗮𝗿𝗱: 𝗪𝗵𝘆 𝗬𝗲𝗮𝗿-𝗥𝗼𝘂𝗻𝗱 𝗣𝗶𝘁𝗰𝗵 𝗥𝗲𝗹𝗶𝗮𝗯𝗶𝗹𝗶𝘁𝘆 𝗠𝗮𝘁𝘁𝗲𝗿𝘀 𝗠𝗼𝗿𝗲 𝗧𝗵𝗮𝗻 𝗘𝘃𝗲𝗿
Too wet to play. Now, too hard to play.
Waterlogged pitches have long been a familiar winter challenge. Now, prolonged heat and dry spells are leaving some natural grass pitches rock hard and unsafe to play on.
Pitch reliability has become a 365-day challenge.
For clubs like Spalding United FC moving to a FIFA Quality Pro artificial grass pitch means a safe, reliable surface, greater fixture certainty and more football throughout the year.
🔗 Read the full article: https://pstsport.com/from-waterlogged-to-rock-hard-why-year-round-pitch-reliability-matters-more-than-ever/
▶️👇
06/08/2026
Phase 2 of works progressing at DCU. Old carpet removed, tarmac bases swept and ready for new carpet install for 4 no. artificial grass surfaces.
Topsoil nearly stripped and ready for cut and fill at Beggsboro Football Club in Cabra for a 94m x 64m FIFA Quality artificial grass pitch.
A full turnkey project by PST Sport, including pitch construction, fencing, netting and floodlights, delivering a state-of-the-art facility for the club and local community.
29/07/2026
📍 𝗡𝗲𝘄 𝗣𝗿𝗼𝗷𝗲𝗰𝘁 | 𝗕𝗲𝗴𝗴𝘀𝗯𝗼𝗿𝗼 𝗔𝗙𝗖
Works are officially underway at Beggsboro AFC, where we’re converting the grass pitch at the club’s home grounds on Kilkieran Road in Cabra to a state-of-the-art artificial grass pitch.
This project is a full turnkey delivery by PST Sport, including pitch construction, fencing, netting and lighting.
Once complete, this new facility will give the club a dedicated base that stays operational throughout the year, ensuring zero weather cancellations and maximum playing time for everyone from academy teams to senior squads, as well as local students at Cabra Community College.
28/07/2026
📍 𝗡𝗲𝘄 𝗣𝗿𝗼𝗷𝗲𝗰𝘁 | 𝗪𝗶𝗻𝗴𝗮𝘁𝗲 & 𝗙𝗶𝗻𝗰𝗵𝗹𝗲𝘆 𝗙𝗖
Topsoil strip underway at the Maurice Rebak Stadium in London as work begins on a new full-size FIFA Quality artificial grass pitch.
This facility upgrade includes full groundworks, an enhanced drainage system and new floodlight bases. The surface system will be TriPlex 45 laid over preformed pad.
Moving to a world-class FIFA Quality artificial grass surface like this will eliminate weather postponements, maximise weekly playing hours and completely transform both matchday operations and the club’s wider facilities.
📍 𝗣𝗿𝗼𝗷𝗲𝗰𝘁 𝗨𝗽𝗱𝗮𝘁𝗲 | 𝗞𝗶𝗹𝗱𝗮𝗿𝗲 𝗧𝗼𝘄𝗻 𝗔𝗙𝗖
Work is progressing well on the club’s new 11-a-side FIFA Quality artificial grass pitch at Rathbride Road.
Drainage and the 3-inch stone layer are due to be completed this week, and ready for fencing installation to begin.
23/07/2026
Phase 2 at TU Dublin / OT Baile Átha Cliath is progressing well. All green and ready for white line installation at the Grangegorman campus for a full-size artificial grass pitch.
This phase also includes resurfacing the 7-a-side pitch.
📍 𝗣𝗿𝗼𝗴𝗿𝗲𝘀𝘀 𝗨𝗽𝗱𝗮𝘁𝗲 | 𝗖𝗵𝗲𝗿𝗿𝘆 𝗢𝗿𝗰𝗵𝗮𝗿𝗱 𝗙𝗖
The old carpet has been removed at Elmdale Park, and the base has been graded, dragged and rolled ahead of independent testing by Sports Labs Ltd today.
Once approved, CCGrass TriPlex 45 will be installed over 12 mm shockpad and infilled with ProGran green performance infill.
Sports Labs will then return to complete testing to FIFA Quality Pro standards.