Cost-cutting Project - Solar power system

Cost-cutting Project - Solar power system

Share

Solar power services. Materials & installation. EV wall charger installation

Photos from Cost-cutting Project - Solar power system's post 10/06/2026

LiFePO4 battery has just arrived ✅
Safe, long-life energy storage for your solar system. Next: installation schedule.

Eitai LiFePO4 = 8000 life cycles, 90% DOD, zero maintenance, full peace of mind.

* 314ah (16.0kw)
* 200ah (10.24kw)

Photos from Cost-cutting Project - Solar power system's post 08/06/2026

Thanks Bacolod City!

Solar project: 8.0kwp Hybrid system with Deye, Aiko 650w each solar panels and 16kwp (314ah) Dyness powerbrick battery.

Cost-cutting Project - Solar power system

06/06/2026

We’re done!
8.0kwp Hybrid Deye inverter with 650watts Aiko panels and 314AH Dyness powerbrick LifePO4 battery. Canlaon View Subdivision, Murcia Negros Occidental.

04/06/2026

8.0kwp Hybrid Deye system with 650watts Aiko BC solar panels and 314ah Dyness powerbrick LifePo4 battery.

Heavy-duty mounting system for maximum wind resistance . 3 railings each panel with 4 Lfoot mountings and splicer. Canlaon View Subdivision, Murcia Negros Occidental.

02/06/2026

@ Canlaon View Subdivision Murcia Negros Occidental.

Installation of 8.0kwp Hybrid Solar power system
with 314ah Dyness PowerBrick LifePo4 battery.

Photos from Cost-cutting Project - Solar power system's post 31/05/2026

Materials already in Bacolod City. See you!

Hybrid system for installation:
8.0kwp Hybrid Deye Inverter
650watts Aiko solar panels
314ah (16kwp) Dyness LifePo4 battery.

Thanks Ms. Kylenne of Ian Solar and Ms. Tintin of Unisolar for the support🙏

Photos from Cost-cutting Project - Solar power system's post 30/05/2026

Commissioning done👏🏻.
12.0kwp Hybrid Deye Inverter/ 18pcs , 620watts Jinko panels. 314ah battery to follow.
Salvador Betterliving Subd. Brgy. Don Bosco, Parañaque City.
Working operational

Photos from Cost-cutting Project - Solar power system's post 27/05/2026

Everything is smooth sailing talaga kung yung client and installer ay may one goal at never pinapangunahan/ interrupt ng client ang diskarte ng installer.

As installer, we promised to provide good system , 100% safe to ensure the investment is worth it.
And, we protect the workmanship warranty (3yrs).

Yun naman ang purpose kaya nga kumuha ng solar installer company dahil ang client almost or zero idea kung paano mapagana 100% and protect the system safe.

* 12.0kw Hybrid solar power system:
with Deye 12kwp hybrid 18pcs, Jinko 620watts
panel and 2pcs of 10kw (200ah) Eitai LifePo4
battery.

Location: Don Bosco Village, Betterliving Parañaque City.

Photos from Cost-cutting Project - Solar power system's post 26/05/2026

Another 12.0kwp hybrid solar power system installation. Done and working good condition!

Grateful to have a very supportive client.
Thanks Sir Ray🙏.
Highly appreciate the full support and understanding.

@ Betterliving Subd. Paranque

Photos from Cost-cutting Project - Solar power system's post 23/05/2026

5.23.2026: Hybrid system - 12.0kwp for today installation Brgy. Don Bosco, Better Living Subdivision

Want your business to be the top-listed Gym/sports Facility in Parañaque?

Click here to claim your Sponsored Listing.

Location

Website

Address


Betterliving Barangay Don Bosco Parañaque
Parañaque
1711