10/30/2026
Update Friday 10/30/26 301pm
1. New power rack arriving in November.
2. Showers/lockers/restrooms/saunas open when flooring is complete and cured. Sometime after 11/12/26.
3. Pool will open after showers are opened.
4. Fully opened means everything is opened. Everything is always subject to change. Anticipated fully open on 11/19/26 at this point.
5. Phones available for inbound calls after front desk is built. Probably after 11/19/26.