09/01/2026
Now that the Stony Brook Bridge has been replanked and made safe, we can post that a lot of work has been done from Bailey Hill down the Powerline Trail towards the Big Stop. The dry weather this summer has allowed us to get this work done. Rock removal, drainage work, culverts installed, gravel hauled, stone hauled, and a lot of the trail has been leveled. With the news of the circle K in town possibly closing in November, we wanted to get this trail in shape. Thank you, Duane Carlow, for all the work!