04/06/2019
Different perspective. Still needs a hot coat and fin box installation
You’ve got a story, so do the boards we build; bespoke, handcrafted, and perfectly displayed underfoot or on the wall.
04/06/2019
Different perspective. Still needs a hot coat and fin box installation
03/21/2019
I’d say this turned out prrrrretty darn good.
03/08/2019
Making that smooth transition....
03/02/2019
Much better.
03/02/2019
Tail block glued in place. Let’s give it a little trim...
02/19/2019
That ‘oooooh’ feeling when shaping rails with sharp tools.
01/27/2019
Building out the rails, then shaping them by hand. One step closer to seeing this mask come to life. The dark sections of the eye, which will disappear once the board is glassed, are caused by epoxy being used to apply the pearl metal flake.
01/05/2019
Sometimes it’s not about the details, sometimes it is.
the details after glassing
First passes of epoxy on glass.
📷:
01/04/2019
Time to throw a layer of 6oz fiberglass cloth on the Lake Geneva board. Thanks to for being a great supplier to account for my adjusted work window. Maybe we’ll live stream the bottom glassing - when the epoxy hits the hand-dyed blues of wood veneer... maybe around 5p...