04/16/2022
The walls done on the inside.
AZN Gear creates components and kits for high end custom electric skateboards AZN Gear creates components and kits for custom high end electric skateboards
04/16/2022
The walls done on the inside.
12/04/2021
Doo, doo, doo, lookin' out my back door...
11/28/2021
Got the first corner wall done.
11/24/2021
Floor plates installed and getting ready for Bondo. Then I can start the walls.
11/24/2021
Floor plates are painted and being installed.
11/21/2021
Working on floor brackets for the trailer. 13 of these will hold the box to the frame. Now some paint and they can be installed tomorrow.
08/29/2021
Finished milling the first batch of frame stock. Made a huge mess at the Woodshed.
08/29/2021
Milling down the Douglas fir for the trailer box frame and got some cool grain. To bad no one will see it after the trailer is done.
08/06/2021
Started the build of my trailer a few weeks ago and just getting to posting. It has 4 bunks and a small storage and bathroom area. Rough road capable. Fully insulated with glue laminated plywood and foam walls. 400 watts of solar on the roof. More details to come soon...
07/02/2017
Been super busy with work and getting this done. This is just a teaser image. More to come.
Working on my latest board.
Click the link below for the full story:
http://azngear.com/been-super-busy-with-work-and-getting-this-done-this-is-just-a-teaser-image-more-to-come/
07/02/2017
OOPS. Resin Fill Gone Wrong
This is what happens when resin filling goes wrong.
Click the link below for the full story:
http://azngear.com/oops-resin-fill-gone-wrong/
06/17/2017
VESC-X on Custom Heat Sink Mounting Plates. Also added a XT-90 Connector and longer motor wires with 5.5mm bullets
Modified VESC-X (now called FOCBOX).
Click the link below for the full story:
http://azngear.com/vesc-x-on-custom-heat-sink-mounting-plates-also-added-a-xt-90-connector-and-longer-motor-wires-with-5-5mm-bullets/