08/22/2026
Today’s job removed old 4’ x16’ bridge and built a new 5’x16’ new bridge
We offer Dock Repair/ Re-Floats/Pressure Washing and much more
08/22/2026
Today’s job removed old 4’ x16’ bridge and built a new 5’x16’ new bridge
08/15/2026
Today’s job pressure washing and came back to do the stain 🫡🙏
08/12/2026
Today’s job removed old steps and build a new set of steps
07/29/2026
Today’s jobs install one missing float and the second job removed old pipes and install new ones
07/25/2026
Today’s beautiful big project done 🙏🙏😬😅🫡
07/07/2026
Today’s job replaces both pit man’s and all new stainless steel tank bands.
06/17/2026
Today’s job install a new 4x8’ float and welded new handrails
05/21/2026
Today’s jobs move one dock out and delivery another dock to he’s new address
05/17/2026
Today’s job removed 9 old set of steps and built new set of 12 steps 🫡🙏
04/30/2026
Today’s job replace two bad floats and bring them back to landfill
| Monday | 7:30am - 5:30pm |
| Tuesday | 7:30am - 5:30pm |
| Wednesday | 7:30am - 5:30pm |
| Thursday | 7:30am - 5:30pm |
| Friday | 7:30am - 5:30pm |
| Saturday | 8am - 2pm |