09/21/2026
The kids are back at school, days are getting shorter, Labor Day has come & gone...It's time to wish Summer 2026 Farewell, and prepare for the winter weather.
ALL BOATS IN POK DRY STACK MUST be WINTERIZED, PLUGGED & BAGGED BEFORE NOVEMBER 14TH
*Port of Kimberling Dry Stack is CLOSED: 11/15/26 - 3/15/27*
MANDATORY
Lower Units MUST be bagged (used 3-10 Mil bags)
Water System Drains MUST be plugged
Boats MUST be tagged after completion (tags available at marina office)
Do NOT fill Fuel Tank completely
All Plugs MUST be reinstalled
Antifreeze MUST be collected and disposed of elsewhere
RECOMMENDED
Disconnect or remove batteries to avoid draining over the winter
Stabilize gas to avoid moisture formation