30/12/2025
Timber Deck installed 1mm intersection nailed, 4mm Evolite torch on and painted silver /aluminum paint.
Waterproofing
30/12/2025
Timber Deck installed 1mm intersection nailed, 4mm Evolite torch on and painted silver /aluminum paint.
18/12/2025
Waterproofing
19/11/2025
Waterproofing roof with SP4 derbigum torch on
06/11/2025
Waterproofing work🦺🦺
This is how shower is done.
01/05/2025
🔥🔥
01/05/2025
Roof leakage done some patches and silver paint. (Maintanace)
01/05/2025
Shower is done
Neoprene primer and Tile safe on the floor .two coats of hydroflex on walls.
18/10/2024
At mabue project we still running,waterproofing us we do...thank you