The Team worked very hard and the project was successful.
A postmortem sitting
We manage multi-disciplinary project from feasibility through front-end design, manage implementation and close out.
Singalakha Technologies (Pty) Ltd is an Engineering and Construction business sector that offers clients with one point of coordinated and technologically persuaded solution for multi-disciplinary projects, plant maintenance, shutdown & turnaround services and new designs. We experts in supporting our clients with resources and even manage them on client’s behalf. Targeted Industries are but not l
13/02/2021
The Team worked very hard and the project was successful.
A postmortem sitting
Today was the day to finally see if "sinyindile" or not. When we commission the Cradle for the first time, it couldn't move smoothly as if there was a hand brake on. (Vid #1)
We found out that the middle row wheels are tight. Had to remove, re align and tighten again.
Second time test was a success (Vid #2)....
Now we wait for the LMI to witness the final test tomorrow.
03/02/2021
Today marks the achievement of the critical milestone at the Slipway Maintenance Project. The 85 Cradle Wheels are all installed and the Cradle back on its track.
Cradle was little bit misaligned due to the manual lifting, but a quick thinking solved the problem when Mvetshane was callee to task.
12/12/2020
Earlier Today... job well done. Installation of Shaving Block (wire rope wear pads).
at TNPA Port of Mossel Bay
12/12/2020
Quick handrail replacement job at TNPA Port of Mossel Bay.
09/11/2020
Slowly but surely we getting there. Big ups to the team for the hard work.
03/11/2020
This may be much easier if the bolts were not corroded. But big ups to the team, working tirelessly to get the job done ans safe.
Foam Booster Pump couldn't start client couldn't figure out what was the problem.
The pump last operated in 2018 and always out offshore. The salty atmosphere corroded some switches and seized other valves/levers.
Opened up engine, cleaned it up replaced choke liver and cleared rust on seized valves. Pump was back in operation within 24hrs
17/06/2020
Singalakha Technologies at your service... Engineering made simple
12/06/2020
The new normal has hit the ground running....virtual compulsory clarification meetings are starting to become a new normal....
This will help businesses to save on travelling costs, and will also help those who like to send non-qualified representatives to become part of the meeting themselves.
11/06/2020
Did you throw away your engine block because of a crack that an Engineering company or a Mechanic couldn't fix?
Now we have the solution for you.... Belzona 1111 a repair paste grade composite material is to the rescue...
For more details contact us.
How to Repair a Cracked Engine Block A in a vehicle is not uncommon and certainly does not mean the end of the engine's lifespan. There are various methods of repairing crack...
31/01/2020
Belzona 1212 Repair and Rebuild....Belzona 5831 Protect against corrosive wet environment
With Belzona no job is too small and no job is too big.
| Monday | 08:00 - 17:00 |
| Tuesday | 08:00 - 17:00 |
| Wednesday | 08:00 - 17:00 |
| Thursday | 08:00 - 17:00 |
| Friday | 08:00 - 17:00 |