23/10/2026
A message from our Secretary Warren
"I realize the opening of the SSAA range on Mendoran Rd has taken a lot longer than expected and has frustrated many members including myself so I thought I would give an update. Due to the excessive time it has taken between the construction of the mounds etc, the number of goats climbing all over them and the number of storms we've had over the last couple of years the soil has been washed down creating lots of exposed rocks and as one can appreciate, a possible risk of ricochets, that's a safety risk thus the use of the range had to be postponed, in turn SSAA NSW has organised a contract range inspector to do an inspection and report. Dubbo branch is holding a working bee tomorrow Saturday the 24th at which we hope to mark out the 500 metre range so it is ready for use once we get clearance from a Range inspector. SSAA NSW has now employed the same inspector full time, He is coming to Dubbo on the 10th November to go over the range with representatives of Dubbo committee, with the intention of getting the 500 metre range open and a clear understanding of all other hiccups that we have to handle"
Stay tuned in the event the weather turns on us tomorrow we will keep you posed here. The same goes for the post inspection visit and report.