LCRA

LCRA

Share

We enhance the quality of life of the Texans we serve through water stewardship, energy and community service.

Photos from LCRA's post 07/17/2026

Here's a look at Wirtz Dam and Starcke Dam on Friday morning.

Multiple floodgates are open at both dams to pass floodwaters into Lake Travis.

Lake Travis has risen almost 6 feet since yesterday. Lake Travis is expected to rise to a range of 682 to 684 feet above msl through Saturday, July 18.

07/17/2026

Floodgate operations continue at Starcke Dam, passing water from Lake Marble Falls into Lake Travis.

LCRA projects Lake Travis will rise to between 680 and 681 ft. msl through Friday. Additional inflows could cause the lake to rise into its flood pool.

07/16/2026

Floodgate operations are underway at Wirtz Dam. This water will be passed downstream into Lake Marble Falls, through Starcke Dam, and into Lake Travis.

LCRA projects Lake Travis will rise to between 680 and 681 ft. msl through Friday. Additional inflows could cause the lake to rise into its flood pool.

07/16/2026

The Pedernales River near Fredericksburg Thursday morning, as seen by an LCRA hydrologist checking one of our Hydromet gauges.

The Pedernales River is one of the major tributaries that flows into Lake Travis. Our teams are continuing to monitor weather, rainfall and river conditions across the basin.

07/16/2026

UPDATE (Saturday July 18, 9:46 AM): One floodgate is open at Mansfield Dam to pass floodwater downstream, with a second expected to open around 1 p.m. Saturday, July 18.

Lake Travis is expected to rise to a range of 685 to 686 feet above msl through Saturday. More info about the Mansfield Dam flood pool: https://www.lcra.org/water/flood-management/key-elevations-for-lake-travis-during-floods/

Also open: one floodgate at Tom Miller Dam, plus multiple floodgates at both Wirtz Dam and Starcke Dam.

Conditions are dynamic. Additional floodgate operations may be needed. Visit www.lcra.org/flood for more info.
__________

UPDATE (5:09 PM): One floodgate is open at Tom Miller Dam to pass floodwater downstream.
__________

UPDATE (3:21 PM): The planned floodgate opening at Tom Miller Dam is expected later this afternoon, the exact timing may vary based on conditions.
__________

UPDATE (2:13 PM): Floodgate operations are expected at Mansfield Dam and Tom Miller Dam.

LCRA will open at least two floodgates at Mansfield Dam tomorrow, Saturday, July 18. The first gate is expected to be opened around 6 AM. The second gate is expected to be opened at 1 PM.

LCRA will also open one floodgate today at Tom Miller Dam around 3 PM.

Multiple floodgates remain open at both Wirtz Dam and Starcke Dam.

Conditions are dynamic and additional floodgate operations may be needed. Visit www.lcra.org/flood for more info.
__________

UPDATE (Friday July 17, 9:46 AM): Multiple floodgates remain open at both Wirtz Dam and Starcke Dam to pass floodwaters into Lake Travis.

Lake Travis has risen almost 6 feet since yesterday. Lake Travis is expected to rise to a range of 682 to 684 feet above msl through Saturday, July 18.
__________

UPDATE (8:32 PM): Multiple floodgates are open at Wirtz Dam and Starcke Dam.
__________

UPDATE (5:50 PM): One gate is open at Wirtz Dam and multiple gates are open at Starcke Dam to pass storm runoff downstream.
__________

UPDATE (4:14 PM): Floodgate operations are underway at Wirtz Dam and Starcke Dam. LCRA plans to open additional floodgates at both dams later this evening.

The water will be passed downstream into Lake Travis. Flows below the dams will be higher and faster than usual.

LCRA projects Lake Travis will rise to between 680 and 681 ft. msl through Friday. Additional inflows could cause the lake to rise into its flood pool.

More info about Lake Travis flood elevations: https://www.lcra.org/water/flood-management/key-elevations-for-lake-travis-during-floods/
__________

⚠️ LCRA plans to open multiple floodgates at Wirtz Dam and at Starcke Dam later today (Thursday, July 16). Take action now to protect people and property that may be affected.

More info: lcra.org/flood

REMINDER: Wirtz Dam creates Lake LBJ and Starcke Dam creates Lake Marble Falls. The runoff will flow from Lake LBJ into Lake Marble Falls and then into Lake Travis.

LCRA HYDROMET 07/15/2026

As rain moves through Central Texas, we're continuing to monitor weather, rainfall and river conditions across the basin.

LCRA’s Hydromet has the latest data on rainfall, lake levels, streamflow and more to help you stay informed:

LCRA HYDROMET LCRA’s Hydromet is a system of more than 280 automated river and weather gauges throughout the lower Colorado River basin in Texas. The Hydromet provides near-real-time data* on streamflow, river stage, rainfall totals, temperature and humidity.

07/14/2026

UPDATE (6:39 PM): Floodgate operations at Bastrop Dam have concluded.
__________

UPDATE (1:45 PM): LCRA has partially opened a floodgate at Lake Bastrop Dam to release stormwater. Water will flow down Spicer and Piney creeks to the Colorado River. Take action to protect people and property that may be affected .

More info: http://www.lcra.org/flood
__________

We’re keeping an eye on the weather. 🌧️

Rain is in the forecast over the next several days and our teams are closely monitoring conditions across the Colorado River basin.

If rainfall leads to floodgate operations, we’ll share updates here and through LCRA’s Flood Operations Notification Service (FONS).

Want to be notified directly?
Sign up for FONS to receive email, text or phone alerts about floodgate operations: www.lcra.org/fons

We’ll continue monitoring conditions and provide updates as needed.

Photos from LCRA's post 07/13/2026

October 2026 projections are here! 🌊 Here's what our model shows for the Highland Lakes:

Lake Travis ranges from 659-664 feet | Lake Buchanan ranges from 1014-1017 feet

We can't forecast rainfall with certainty, but 75+ years of actual weather history shows us what's realistic. These ranges reflect wet to extreme dry scenarios based on where we stand today. Explore the full 6-month outlook: https://www.lcra.org/water/highland-lakes-overview/

07/09/2026

Your sprinkler system doesn’t check the forecast… but it could. 🌧️

Rain sensors and smart irrigation controllers can automatically skip watering when Mother Nature’s already got it covered. So you can save water without lifting a finger.

Bonus: We offer rebates to help you make the switch.

More info: www.watersmart.org/rebates

07/08/2026

Beekeeping as a family affair. 🍯

When she’s Off the Grid Kelly Mikulin runs Bro Bears Honey with her husband and 10-year-old son. From caring for the bees to harvesting, it's a team effort that turns passion into something sweet.

Want your business to be the top-listed Gym/sports Facility in Austin?

Click here to claim your Sponsored Listing.

Location

Telephone

Address


3700 Lake Austin Boulevard
Austin, TX
78703