08/10/2026
Everyone loves a pristine “after” photo, but ours is a working yard, so it’s never going to stay spotless for long! 🚜
It’s hard to believe this was once just a field. We excavated nearly 3 metres down in places, installed around 600 metres of drainage pipe, including a 250-metre run along the bank, and built in access points so the lorry’s toilet box can be emptied easily into the pit.
The finished concrete road and yard are a big transformation, but much of the hard work is hidden underneath. A huge thanks to team Green Hall 👏