09/10/2026
HECTIC TIME AT OAKLEY BOWLING CLUB
No sooner had the season ended, than volunteer members and Avonmore our contractors were carrying out the many tasks necessary to ensure our green is in tip top condition for the 2027 season. Last week our volunteers worked so hard ensuring, amongst many things, that the
outdoor seating and tables went into storage, benches were covered with tarpaulins and that the rubber ditch mats were collected up, jet washed and dried prior to also being put into storage. The irrigation system was drained down.
The green was now ready for our contractors who, on Wednesday scarified the green, using two ride-on machines, which criss-crossed the green in various directions for about an hour. Next the green was hollow cored before it was slit to aid grass seeding and mown to collect up any debris not already collected. Fungicidal spray was then applied before the green was over seeded and 6 tonnes of top dressing applied by machine. Finally, the top dressing was manually evened out pushing the top dressing into the core holes.
All this work was completed over a 4-hour period. We dread to think how long it might have taken if, as up to a few years ago, members had carried out this work themselves. Well done John Yarrall who arranged and oversaw everything.