03/11/2026
✅ Another boxed off in Broadway for CDRC ✅
An absolute pleasure to carry out works for this returning customer:
Their lawn unfortunately had reached the end of its life so after a detailed assessment we decided that the best thing to do was to remove what was left of the top soil and clay sub base, re grade, airate the soil and lay a new nutrient rich, RHS approved top soil and seed bed matched by our seed ecologist.
They took the opportunity to install over 100m of steel Cor-Ten edging and reinstate failed land drains, all whilst leaving in situe the old font from Nottingham cathedral (which would have some stories to tell)
This job was all about getting it done but with a sympathetic approach, whilst battling the unsympathetic weather we have had.
Big pat on the back to all involved in this one, onto the next 💥